a国产,中文字幕久久波多野结衣AV,欧美粗大猛烈老熟妇,女人av天堂

當(dāng)前位置:主頁 > 科技論文 > 交通工程論文 >

軟弱圍巖隧道大變形控制技術(shù)研究

發(fā)布時(shí)間:2018-10-09 16:49
【摘要】:在已規(guī)劃和設(shè)計(jì)的隧道中,軟弱圍巖隧道越來越多,,由于現(xiàn)在對(duì)軟弱圍巖大變形產(chǎn)生的機(jī)理和變形控制在設(shè)計(jì)和施工中均沒有形成一個(gè)完整系統(tǒng)的理論體系,因此,對(duì)軟弱圍巖大變形理論、開挖工法和支護(hù)控制措施進(jìn)行研究,解決軟弱圍巖隧道開挖所產(chǎn)生的大變形等災(zāi)害就越顯的迫在眉睫。 本論文以迎風(fēng)隧道為工程依托,以相關(guān)文獻(xiàn)為基礎(chǔ),對(duì)軟弱圍巖大變形概念、大變形發(fā)生機(jī)理、大變形劃分類型、大變形的界定和等級(jí)劃分進(jìn)行了總結(jié)分析。介紹了迎風(fēng)隧道地形地質(zhì)、圍巖特性、等級(jí)劃分、施工中產(chǎn)生的大變形問題及大變形力學(xué)分析。采用巖土工程軟件FLAC3D針對(duì)該隧道特定的工程地質(zhì)條件進(jìn)行大變形模擬驗(yàn)證,并針對(duì)該隧道大變形的工程特點(diǎn)和現(xiàn)場(chǎng)情況,提出了兩種控制技術(shù):①隧道圍巖擴(kuò)挖控制技術(shù);②預(yù)應(yīng)力錨索支護(hù)控制技術(shù)。 隧道圍巖規(guī)律性擴(kuò)挖大變形控制技術(shù)研究:通過選取某開挖斷面,采取0.60m、0.65m、0.70m和0.75m四種擴(kuò)挖量對(duì)隧道圍巖和擴(kuò)挖支護(hù)、初期支護(hù)應(yīng)力,以及擴(kuò)挖輪廓線、初支內(nèi)外側(cè)輪廓線上隧道不同部位豎向沉降位移、水平收斂位移模擬和對(duì)比,對(duì)該方案的可行性及合理擴(kuò)挖量進(jìn)行分析。 預(yù)應(yīng)力錨索支護(hù)控制技術(shù)研究:采用不同等級(jí)預(yù)應(yīng)力錨索對(duì)隧道加固模擬計(jì)算,對(duì)隧道圍巖、初期支護(hù)和錨索軸力、應(yīng)力,以及初支內(nèi)外側(cè)輪廓線隧道不同部位的豎向沉降位移、水平收斂位移對(duì)比,分析預(yù)應(yīng)力錨索對(duì)隧道大變形控制效果。 論文在最后對(duì)兩個(gè)控制方案的大變形控制效果做了總結(jié)和對(duì)比分析,給出有效的控制方案,即通過隧道圍巖規(guī)律性擴(kuò)挖來進(jìn)行大變形控制。并指出了隧道大變形尚未解決的問題,即理論體系和工程實(shí)踐中控制技術(shù)中存在的難題。
[Abstract]:Among the tunnels that have been planned and designed, there are more and more soft surrounding rock tunnels. Because the mechanism and deformation control of large deformation of soft surrounding rock have not formed a complete and systematic theoretical system in design and construction, In this paper, the theory of large deformation of soft surrounding rock, excavation method and supporting control measures are studied. It is more and more urgent to solve the disasters such as large deformation caused by excavation of soft surrounding rock tunnel. Based on the engineering of windward tunnel and related literature, this paper summarizes and analyzes the concept of large deformation of soft surrounding rock, the mechanism of large deformation, the classification of large deformation, the definition and grade of large deformation. This paper introduces topographic geology, surrounding rock characteristics, classification of surrounding rock, large deformation problem and mechanical analysis of large deformation in construction of windward tunnel. The geotechnical engineering software FLAC3D is used to simulate and verify the large deformation of the tunnel's specific engineering geological conditions. According to the engineering characteristics and site conditions of the tunnel, two kinds of control techniques are put forward. 2 Prestressed anchor cable support control technology. Study on the control technology of large deformation of tunnel surrounding rock: by selecting a certain excavation section, four kinds of expanding excavations, including 0.60mL 0.65mm 0.70m and 0.75m, to the surrounding rock and support of tunnel, the initial support stress, and the contour line of the expanded excavation, are adopted. The vertical settlement displacement and horizontal convergent displacement of different parts of the tunnel on the inner and outer side contour of the primary support are simulated and compared. The feasibility of the scheme and the reasonable amount of expansion are analyzed. Study on the Control Technology of Prestressed Anchor Cable support: using different grades of Prestressed Anchorage cables to simulate the reinforcement of the tunnel, the axial force and stress of the surrounding rock, the initial support and the anchor cable of the tunnel are calculated. The vertical settlement displacement and horizontal convergent displacement of different parts of the tunnel with the inner and outer side profile of the initial support are compared and the control effect of the prestressed anchor cable on the large deformation of the tunnel is analyzed. At the end of the paper, the control effect of the two control schemes is summarized and compared, and the effective control scheme is given, that is, the large deformation control is carried out by the regular expansion and excavation of the surrounding rock of the tunnel. It also points out the unsolved problems of large deformation of tunnel, that is, the problems existing in the theory system and control technology in engineering practice.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U452.12;U455.4

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 徐林生,李永林,程崇國;公路隧道圍巖變形破裂類型與等級(jí)的判定[J];重慶交通學(xué)院學(xué)報(bào);2002年02期

2 羅清明,李亮,楊小禮;軟巖隧道的圍巖變形計(jì)算[J];長(zhǎng)沙鐵道學(xué)院學(xué)報(bào);2003年02期

3 趙瑜;李曉紅;盧義玉;康勇;;深埋隧道圍巖應(yīng)變軟化模型參數(shù)的正交設(shè)計(jì)[J];重慶大學(xué)學(xué)報(bào);2008年07期

4 李斌;漆泰岳;高波;曠文濤;;新意法(巖土控制變形工法)概述[J];公路隧道;2009年02期

5 符華興;強(qiáng)擠壓圍巖隧道施工支護(hù)技術(shù)的商榷[J];隧道建設(shè);2003年01期

6 翟進(jìn)營;楊會(huì)軍;王莉莉;;新意法隧道設(shè)計(jì)施工概述[J];隧道建設(shè);2008年01期

7 段慶偉,何滿潮,張世國;復(fù)雜條件下圍巖變形特征數(shù)值模擬研究[J];煤炭科學(xué)技術(shù);2002年06期

8 朱德仁;巖石工程破壞準(zhǔn)則[J];煤炭學(xué)報(bào);1994年01期

9 劉志春;孫明磊;賈曉云;朱永全;;烏鞘嶺隧道F4~F7斷層區(qū)段壓力、應(yīng)力實(shí)測(cè)與分析[J];石家莊鐵道學(xué)院學(xué)報(bào);2006年02期

10 孫明磊;劉志春;張德瑩;;烏鞘嶺隧道F7斷層區(qū)段左線迂回導(dǎo)坑監(jiān)控量測(cè)[J];石家莊鐵道學(xué)院學(xué)報(bào);2006年02期



本文編號(hào):2260058

資料下載
論文發(fā)表

本文鏈接:http://www.wukwdryxk.cn/kejilunwen/jiaotonggongchenglunwen/2260058.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶1fa91***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com
色婷婷五月综合丁香中文字幕| 丰满少妇av| 国产日韩精品一区| 狠狠干b| 欧美熟妇另娄久久久久久| 国产精品国产三级国产普通话| 欧美最猛性XXXX| 亚洲AV无码专区在线播放中文| 中文字幕一区在线观看视频| 亚洲人成人无码网WWW国产| 丁香五月激情综合激情综合激情| 中国国语毛片免费观看视频 | 亚洲AV无码国产永久播放蜜芽| 欧美婷婷六月丁香综合色| 成人免费AV一区二区三区| 五月激激激综合网亚洲| 欧洲成人一区二区三区| 无码人妻精品一区二区三区不卡| 精品AⅤ一区二区三区| 伊人久久大香线蕉综合影院首页| 尤物麻豆AV在线| 国产精品综合AV一区二区国产馆 | 激情五月综合| 聂荣县| 九台市| 成人av免费视频在线观看| 狠狠躁日日躁夜夜躁2020| 日韩99在线 | 中文| 久久久中日ab精品综合| 女同亚洲一区二区无线码| 色婷婷亚洲六月婷婷中文字幕 | 亚洲中文字幕无码中文字在线| 无码人妻丰满熟妇区BBBBXXXX| 精品视频无码一区二区三区| 777国产偷窥盗摄精品品在线 | 日韩精品一区二区AV在线| 精品国产av无码一区二区三区| 亚洲综合电影| 欧美日韩激情在线| 成人h| 国产黄a三级三级三级|