XS房地產(chǎn)公司項(xiàng)目成本控制案例研究
[Abstract]:At present, the real estate industry competition is becoming increasingly fierce, real estate enterprises want to maximize profits, holding a high market share, we must try to reduce the cost. The project cost management level of the real estate development enterprise directly affects the success or failure of the project investment. Strengthening cost control is the weapon for real estate enterprises to enter the cost competition and the basic starting point of enterprise development strategy. As a developing enterprise, it is the responsibility of the society to reduce the cost and stabilize the house price, not only from the development of the enterprise itself, but also from the consumers. These measures are also the strategy for the enterprise to seek self-development. In 2008, real estate in China suffered a sharp fall in house prices, falling sales, tight corporate capital chain and industry crisis, the real estate industry gradually said goodbye to the era of profiteering, into the era of fine management. If real estate enterprises want to realize low cost and high profit, they must attach importance to cost control and control their development cost reasonably and effectively. Based on the analysis of the problems existing in the project cost control of XS real estate company, this paper analyzes the reasons for the imperfection of its cost management system, the untimely formulation of the target cost, the neglect of the cost control in the design stage and the lack of dynamic monitoring of the cost. Using the methods of case analysis, systematic analysis and comparative study, this paper puts forward the countermeasures to improve the cost control of XS real estate company from two aspects: on the one hand, it is to establish and perfect the basic management system of XS real estate company's cost control. Including the establishment and implementation of budget management and control system, the establishment of target cost management system, the establishment of responsibility cost assessment system, etc. On the other hand, the basic management system of cost control is used to establish the stage of investment decision-making and design. The whole process cost control from the bidding stage, the construction stage to the completion stage. Based on the problems of cost control in XS real estate companies, this paper tries to find an effective way to establish a set of cost control methods for small and medium-sized real estate enterprises in order to solve their practical problems.
【學(xué)位授予單位】:昆明理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F299.233.42
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 吳白雪;;宏觀調(diào)控下房地產(chǎn)的成本控制[J];安徽建筑;2007年02期
2 黎旭東;房地產(chǎn)開發(fā)的項(xiàng)目管理和成本控制[J];廣東土木與建筑;2005年08期
3 王忠偉;;房地產(chǎn)開發(fā)項(xiàng)目的成本優(yōu)化控制[J];中國(guó)房地產(chǎn);2006年02期
4 賈善俊;;如何搞好房地產(chǎn)開發(fā)的投資控制和管理[J];中國(guó)房地產(chǎn);2006年06期
5 李建榮;論房地產(chǎn)開發(fā)企業(yè)成本控制與投資決策[J];改革與戰(zhàn)略;2003年07期
6 胡震;;淺談房地產(chǎn)開發(fā)設(shè)計(jì)階段成本管理[J];華東交通大學(xué)學(xué)報(bào);2007年03期
7 王運(yùn)道;房地產(chǎn)開發(fā)企業(yè)工程成本控制[J];技術(shù)經(jīng)濟(jì);2001年02期
8 單保富;;房地產(chǎn)開發(fā)全過程造價(jià)控制研究[J];科技信息(科學(xué)教研);2007年15期
9 張亞凱;劉先民;付清;;淺析降低房地產(chǎn)項(xiàng)目成本途徑與措施[J];萊鋼科技;2006年01期
10 馮偉;論房地產(chǎn)開發(fā)項(xiàng)目全面成本管理與控制[J];四川建筑;2005年05期
,本文編號(hào):2139010
本文鏈接:http://www.wukwdryxk.cn/guanlilunwen/chengbenguanlilunwen/2139010.html